Fuel Pump Room and South Building Demolition

Fuel Pump Room concrete work continues along the south side of the existing South Addition. Crews continue with forming, installing reinforcing and placing concrete at these locations.

Selective demolition of portions of the South Building is ongoing. 

Typical levels of construction noise and truck traffic can be expected with all of these activities.

Global Administrator | 3/4/2021