Saturday Work 7/31
Crews will be onsite Saturday, July 31 from 7 a.m. to 4 p.m. stripping foundation forms, which is similar to the work that was done last Saturday.
Deep foundation, pile cap and grade beam installation is ongoing and will continue for approximately two more weeks. Excavation and grading work are happening at the same time as the deep foundation installations.
The Tower Crane will be lifting stub columns onto the second and third floor roofs.
Typical levels of construction noise and vibrations are expected with all of these activities. For the deep foundation work, any possible vibrations will be monitored by a third party testing agency.