Saturday Work 1/6
Crews will be on site this Saturday 1/6 performing structural steel erection and detailing decking from 7 a.m. to 4 p.m. (depending on the weather).
During the week, the tower crane will be in operation with the super structure steel as steel workers detail decking. Mechanical hangers will be installed on the 2nd, 3rd, 4th, 5th and 6th floors new decks for future installation of mechanical piping. They will also be preparing for concrete slab pours with shear studs, rebar, fire stopping sleeves and embedments. The stair risers are being filled with concrete for easier access from floor to floor and crews are working to install temporary building enclosures using ZAP wrap.
Typical levels of construction noise and vibrations are expected with all of these activities. For the deep foundation work, any possible vibrations will be monitored by a third party testing agency.